Client: VEOLIA WATER SYSTEMS Sp. z o.o.

Period of construction: 2011

During this task has Dabster modernized a set of 14 reversing conveyor and a set of 4 belt conveyors transporting sludge, each with a length of 23 meters. The scope of works covered the exchange of frames, changing the type from the flat one to the “U” shape. Modernization of the side panels with side skirts, chutes and scrapers belt repair and replacement, tensioning and drums adjusting. Additionally Dabster has done installation of an automatic conversion of scrapers for a set of 14 reversing convevors with compressed air supply piping system.

Comments are closed.