Client: Nordural
Design and build - Pneumatic transportation system of cryolite dust material for Nordural aluminum smelter.
Period of construction: 2007
Subject matter and scope of services:
Next project for the aluminum smelter where Dabster was responsible for design, delivery and assembly of three independent pneumatic transportation systems. Firts for transportation of cryolite dust form bucket elevator to storage silo, second for transportation of cryolite dust from the filter in cleaning area to the storage silo and third from cooling conveyor to the storage silo.